Problema con gnomebaker

Imagen de kauna
0 puntos

Intento grabar un cd y obtengo el siguiente indescifrable para un novato mensaje:  

 

 

cdrecord: No write mode specified.
cdrecord: Asuming -tao mode.
cdrecord: Future versions of cdrecord may have different drive dependent defaults.
cdrecord: Continuing in 5 seconds...
cdrecord: Warning: Running on Linux-2.6.15-28-386
cdrecord: There are unsettled issues with Linux-2.5 and newer.
cdrecord: If you have unexpected problems, please try Linux-2.4 or Solaris.
scsidev: '/dev/hdc'
devname: '/dev/hdc'
scsibus: -2 target: -2 lun: -2
Warning: Open by 'devname' is unintentional and not supported.
Linux sg driver version: 3.5.27
Error: Cannot gain SYS_RAWIO capability.Is cdrecord installed SUID root?
: Operation not permitted
cdrecord: Warning: using inofficial version of libscg (debian-0.8debian2 '@(#)scsitransp.c 1.91 04/06/17 Copyright 1988,1995,2000-2004 J. Schilling').
SCSI buffer size: 64512
Cdrecord-Clone 2.01.01a01 (i686-pc-linux-gnu) Copyright (C) 1995-2004 Joerg Schilling
NOTE: this version of cdrecord is an inofficial (modified) release of cdrecord
and thus may have bugs that are not present in the original version.
Please send bug reports and support requests to <cdrtools@packages.debian.org>.
The original author should not be bothered with problems of this version.

TOC Type: 3 = CD-ROM XA mode 2
Using libscg version 'debian-0.8debian2'.
atapi: 1
Device type : Removable CD-ROM
Version : 0
Response Format: 1
Vendor_info : 'Slimtype'
Identifikation : 'COMBO LSC-24081M'
Revision : '3MF4'
Device seems to be: Generic mmc2 DVD-ROM.
Current: 0x000A
Profile: 0x0010
Profile: 0x000A (current)
Profile: 0x0009
Profile: 0x0008
Using generic SCSI-3/mmc CD-R/CD-RW driver (mmc_cdr).
Driver flags : MMC-3 SWABAUDIO BURNFREE FORCESPEED
Supported modes: TAO PACKET SAO SAO/R96P SAO/R96R RAW/R16 RAW/R96P RAW/R96R
Drive buf size : 1895168 = 1850 KB
FIFO size : 4194304 = 4096 KB
Error: Cannot gain SYS_RAWIO capability.Is cdrecord installed SUID root?
: Operation not permitted
4 seconds. 3 seconds. 2 seconds. 1 seconds. 0 seconds. Operation starts.
Waiting for reader process to fill input buffer ... input buffer ready.
BURN-Free is ON.
Turning BURN-Free off
Starting new track at sector: 0
cdrecord: Success. write_g1: scsi sendcmd: no error
CDB: 2A 00 00 00 00 00 00 00 1F 00
status: 0x2 (CHECK CONDITION)
Sense Bytes: 70 00 05 00 00 00 00 0A 00 00 00 00 27 00 00 00
Sense Key: 0x5 Illegal Request, Segment 0
Sense Code: 0x27 Qual 0x00 (write protected) Fru 0x0
Sense flags: Blk 0 (not valid)
resid: 63488
cmd finished after 0.001s timeout 40s
cdrecord: A write error occured.
cdrecord: Please properly read the error message above.

write track data: error after 0 bytes
Writing time: 5.032s
Average write speed 954.1x.
Fixating...
WARNING: Some drives don't like fixation in dummy mode.
Fixating time: 0.001s
cdrecord: fifo had 64 puts and 1 gets.
cdrecord: fifo was 0 times empty and 0 times full, min fill was 100%.

tengo que cambiar el kernel? que tengo que hacer?

He probado con gcombust,nautilus, graveman y k3b. tampoco consigo grabar. 

muchas gracias 

Imagen de kauna
+1
0
-1

  1. cambiar parametros como velocidad, tipo de grabacion, juliet,...
  2. reinstalar .
  3. borrar todos los programas de grabacion e instalar gnomebaker.
+1
0
-1
Imagen de Javier M.
+1
0
-1

De Gnomebaker no te puedo decir porque no lo uso, prefiero K3B porque es fantastico para cualquier tipo de grabacion.

Puede ser que el problema que tenias con K3b fueran los permisos de escritura en disco. Si instalas la nueva version te lo configura automatico, y si no la tienes la solucion es abrirlo desde consola:

sudo k3b 

Realmente esto es un poco chapucilla. Vi por algun sitio como se configuraba para tener permisos pero no me acuerdo donde. De todos modos, asi te funcionara.

Un saludo 

#################################

Funcionara mejor si lo enchufas

+1
0
-1
Imagen de kauna
+1
0
-1

System
-----------------------
K3b Version: 0.12.17

KDE Version: 3.5.2
QT Version: 3.3.6
Kernel: 2.6.15-28-386
Devices
-----------------------
Slimtype COMBO LSC-24081M 3MF4 (/dev/hdc, ) at /media/cdrom0 [CD-R; CD-RW; CD-ROM; DVD-ROM] [DVD-ROM; CD-ROM; CD-R; CD-RW] [SAO; TAO; RAW; SAO/R96P; SAO/R96R; RAW/R16; RAW/R96P; RAW/R96R]

Used versions
-----------------------
cdrecord: 2.1.1a01

cdrecord
-----------------------
/usr/bin/X11/cdrecord: Warning: Running on Linux-2.6.15-28-386
/usr/bin/X11/cdrecord: There are unsettled issues with Linux-2.5 and newer.
/usr/bin/X11/cdrecord: If you have unexpected problems, please try Linux-2.4 or Solaris.
scsidev: '/dev/hdc'
devname: '/dev/hdc'
scsibus: -2 target: -2 lun: -2
Warning: Open by 'devname' is unintentional and not supported.
Linux sg driver version: 3.5.27
Error: Cannot gain SYS_RAWIO capability.Is cdrecord installed SUID root?
: Operation not permitted
/usr/bin/X11/cdrecord: Warning: using inofficial version of libscg (debian-0.8debian2 '@(#)scsitransp.c 1.91 04/06/17 Copyright 1988,1995,2000-2004 J. Schilling').
SCSI buffer size: 64512
Cdrecord-Clone 2.01.01a01 (i686-pc-linux-gnu) Copyright (C) 1995-2004 Joerg Schilling
NOTE: this version of cdrecord is an inofficial (modified) release of cdrecord
and thus may have bugs that are not present in the original version.
Please send bug reports and support requests to <cdrtools@packages.debian.org>.
The original author should not be bothered with problems of this version.
TOC Type: 1 = CD-ROM
Using libscg version 'debian-0.8debian2'.
atapi: 1
Device type : Removable CD-ROM
Version : 0
Response Format: 1
Vendor_info : 'Slimtype'
Identifikation : 'COMBO LSC-24081M'
Revision : '3MF4'
Device seems to be: Generic mmc2 DVD-ROM.
Current: 0x000A
Profile: 0x0010
Profile: 0x000A (current)
Profile: 0x0009
Profile: 0x0008
Using generic SCSI-3/mmc CD-R/CD-RW driver (mmc_cdr).
Driver flags : MMC-3 SWABAUDIO BURNFREE FORCESPEED
Supported modes: TAO PACKET SAO SAO/R96P SAO/R96R RAW/R16 RAW/R96P RAW/R96R
Drive buf size : 1895168 = 1850 KB
FIFO size : 4194304 = 4096 KB
Error: Cannot gain SYS_RAWIO capability.Is cdrecord installed SUID root?
: Operation not permitted
Track 01: data 699 MB
Total size: 803 MB (79:35.54) = 358166 sectors
Lout start: 803 MB (79:37/41) = 358166 sectors
Current Secsize: 2048
ATIP info from disk:
Indicated writing power: 4
Is not unrestricted
Is not erasable
Disk sub type: Medium Type A, high Beta category (A+) (3)
ATIP start of lead in: -11849 (97:24/01)
ATIP start of lead out: 359847 (79:59/72)
Disk type: Long strategy type (Cyanine, AZO or similar)
Manuf. index: 25
Manufacturer: Taiyo Yuden Company Limited
Blocks total: 359847 Blocks current: 359847 Blocks remaining: 1681
Forcespeed is OFF.
Starting to write CD/DVD at speed 2 in dummy TAO mode for single session.
Last chance to quit, starting dummy write in 2 seconds.
1 seconds.
0 seconds. Operation starts.
Waiting for reader process to fill input buffer ... input buffer ready.
BURN-Free is OFF.
Starting new track at sector: 0
/usr/bin/X11/cdrecord: Success. write_g1: scsi sendcmd: no error
CDB: 2A 00 00 00 00 00 00 00 1F 00
status: 0x2 (CHECK CONDITION)
Sense Bytes: 70 00 05 00 00 00 00 0A 00 00 00 00 27 00 00 00
Sense Key: 0x5 Illegal Request, Segment 0
Sense Code: 0x27 Qual 0x00 (write protected) Fru 0x0
Sense flags: Blk 0 (not valid)
resid: 63488
cmd finished after 0.001s timeout 40s
/usr/bin/X11/cdrecord: A write error occured.
/usr/bin/X11/cdrecord: Please properly read the error message above.
Track 01: 0 of 699 MB written.
write track data: error after 0 bytes
Writing time: 5.032s
Average write speed 953.1x.
Fixating...
WARNING: Some drives don't like fixation in dummy mode.
Fixating time: 0.001s
/usr/bin/X11/cdrecord: fifo had 64 puts and 1 gets.
/usr/bin/X11/cdrecord: fifo was 0 times empty and 0 times full, min fill was 100%.

cdrecord command:
-----------------------
/usr/bin/X11/cdrecord.mmap -v gracetime=2 dev=/dev/hdc speed=24 -tao -dummy -data /tmp/kde-oem/k3b_image.iso

mkisofs
-----------------------
INFO: UTF-8 character encoding detected by locale settings.
Assuming UTF-8 encoded filenames on source filesystem,
use -input-charset to override.
0.14% done, estimate finish Fri Apr 20 04:44:27 2007
0.28% done, estimate finish Fri Apr 20 04:38:53 2007
0.42% done, estimate finish Fri Apr 20 04:36:59 2007
0.56% done, estimate finish Fri Apr 20 04:35:54 2007
0.70% done, estimate finish Fri Apr 20 04:35:21 2007
0.84% done, estimate finish Fri Apr 20 04:34:59 2007
0.98% done, estimate finish Fri Apr 20 04:33:01 2007
1.12% done, estimate finish Fri Apr 20 04:32:59 2007
1.26% done, estimate finish Fri Apr 20 04:31:41 2007
1.40% done, estimate finish Fri Apr 20 04:31:49 2007
1.54% done, estimate finish Fri Apr 20 04:33:01 2007
1.68% done, estimate finish Fri Apr 20 04:32:00 2007
1.82% done, estimate finish Fri Apr 20 04:32:06 2007
1.96% done, estimate finish Fri Apr 20 04:32:10 2007
2.09% done, estimate finish Fri Apr 20 04:32:14 2007
2.24% done, estimate finish Fri Apr 20 04:31:31 2007
2.38% done, estimate finish Fri Apr 20 04:31:37 2007
2.51% done, estimate finish Fri Apr 20 04:31:02 2007
2.65% done, estimate finish Fri Apr 20 04:31:09 2007
2.80% done, estimate finish Fri Apr 20 04:30:38 2007
2.93% done, estimate finish Fri Apr 20 04:30:11 2007
3.07% done, estimate finish Fri Apr 20 04:30:19 2007
3.21% done, estimate finish Fri Apr 20 04:30:26 2007
3.35% done, estimate finish Fri Apr 20 04:30:02 2007
3.49% done, estimate finish Fri Apr 20 04:29:41 2007
3.63% done, estimate finish Fri Apr 20 04:29:49 2007
3.77% done, estimate finish Fri Apr 20 04:29:29 2007
3.91% done, estimate finish Fri Apr 20 04:29:37 2007
4.05% done, estimate finish Fri Apr 20 04:29:19 2007
4.19% done, estimate finish Fri Apr 20 04:29:27 2007
4.33% done, estimate finish Fri Apr 20 04:29:11 2007
4.47% done, estimate finish Fri Apr 20 04:29:18 2007
4.61% done, estimate finish Fri Apr 20 04:29:03 2007
4.75% done, estimate finish Fri Apr 20 04:29:10 2007
4.89% done, estimate finish Fri Apr 20 04:28:56 2007
5.03% done, estimate finish Fri Apr 20 04:29:03 2007
5.17% done, estimate finish Fri Apr 20 04:28:50 2007
5.31% done, estimate finish Fri Apr 20 04:28:57 2007
5.45% done, estimate finish Fri Apr 20 04:28:45 2007
5.59% done, estimate finish Fri Apr 20 04:28:51 2007
5.73% done, estimate finish Fri Apr 20 04:28:57 2007
5.87% done, estimate finish Fri Apr 20 04:28:46 2007
6.00% done, estimate finish Fri Apr 20 04:28:52 2007
6.15% done, estimate finish Fri Apr 20 04:28:41 2007
6.29% done, estimate finish Fri Apr 20 04:28:31 2007
6.42% done, estimate finish Fri Apr 20 04:28:37 2007
6.56% done, estimate finish Fri Apr 20 04:28:27 2007
6.71% done, estimate finish Fri Apr 20 04:28:18 2007
6.84% done, estimate finish Fri Apr 20 04:28:24 2007
6.98% done, estimate finish Fri Apr 20 04:28:15 2007
7.12% done, estimate finish Fri Apr 20 04:28:21 2007
7.26% done, estimate finish Fri Apr 20 04:28:12 2007
7.40% done, estimate finish Fri Apr 20 04:28:04 2007
7.54% done, estimate finish Fri Apr 20 04:28:10 2007
7.68% done, estimate finish Fri Apr 20 04:28:02 2007
7.82% done, estimate finish Fri Apr 20 04:28:07 2007
7.96% done, estimate finish Fri Apr 20 04:28:13 2007
8.10% done, estimate finish Fri Apr 20 04:28:05 2007
8.24% done, estimate finish Fri Apr 20 04:28:10 2007
8.38% done, estimate finish Fri Apr 20 04:28:03 2007
8.52% done, estimate finish Fri Apr 20 04:28:08 2007
8.66% done, estimate finish Fri Apr 20 04:28:01 2007
8.80% done, estimate finish Fri Apr 20 04:28:06 2007
8.94% done, estimate finish Fri Apr 20 04:27:59 2007
9.08% done, estimate finish Fri Apr 20 04:28:04 2007
9.22% done, estimate finish Fri Apr 20 04:27:58 2007
9.35% done, estimate finish Fri Apr 20 04:28:02 2007
9.50% done, estimate finish Fri Apr 20 04:28:07 2007
9.64% done, estimate finish Fri Apr 20 04:28:01 2007
9.77% done, estimate finish Fri Apr 20 04:28:05 2007
9.91% done, estimate finish Fri Apr 20 04:28:19 2007
10.06% done, estimate finish Fri Apr 20 04:28:13 2007
10.19% done, estimate finish Fri Apr 20 04:28:17 2007
10.33% done, estimate finish Fri Apr 20 04:28:11 2007
10.47% done, estimate finish Fri Apr 20 04:28:15 2007
10.61% done, estimate finish Fri Apr 20 04:28:19 2007
10.75% done, estimate finish Fri Apr 20 04:28:13 2007
10.89% done, estimate finish Fri Apr 20 04:28:17 2007
11.03% done, estimate finish Fri Apr 20 04:28:21 2007
11.17% done, estimate finish Fri Apr 20 04:28:15 2007
11.31% done, estimate finish Fri Apr 20 04:28:19 2007
11.45% done, estimate finish Fri Apr 20 04:28:22 2007
11.59% done, estimate finish Fri Apr 20 04:28:17 2007
11.73% done, estimate finish Fri Apr 20 04:28:20 2007
11.87% done, estimate finish Fri Apr 20 04:28:15 2007
12.01% done, estimate finish Fri Apr 20 04:28:19 2007
12.15% done, estimate finish Fri Apr 20 04:28:22 2007
12.29% done, estimate finish Fri Apr 20 04:28:17 2007
12.43% done, estimate finish Fri Apr 20 04:28:28 2007
12.57% done, estimate finish Fri Apr 20 04:28:23 2007
12.70% done, estimate finish Fri Apr 20 04:28:18 2007
12.85% done, estimate finish Fri Apr 20 04:28:21 2007
12.99% done, estimate finish Fri Apr 20 04:28:17 2007
13.12% done, estimate finish Fri Apr 20 04:28:20 2007
13.26% done, estimate finish Fri Apr 20 04:28:15 2007
13.41% done, estimate finish Fri Apr 20 04:28:18 2007
13.54% done, estimate finish Fri Apr 20 04:28:21 2007
13.68% done, estimate finish Fri Apr 20 04:28:17 2007
13.82% done, estimate finish Fri Apr 20 04:28:20 2007
13.96% done, estimate finish Fri Apr 20 04:28:15 2007
14.10% done, estimate finish Fri Apr 20 04:28:18 2007
14.24% done, estimate finish Fri Apr 20 04:28:14 2007
14.38% done, estimate finish Fri Apr 20 04:28:17 2007
14.52% done, estimate finish Fri Apr 20 04:28:12 2007
14.66% done, estimate finish Fri Apr 20 04:28:15 2007
14.80% done, estimate finish Fri Apr 20 04:28:18 2007
14.94% done, estimate finish Fri Apr 20 04:28:14 2007
15.08% done, estimate finish Fri Apr 20 04:28:17 2007
15.22% done, estimate finish Fri Apr 20 04:28:19 2007
15.36% done, estimate finish Fri Apr 20 04:28:15 2007
15.50% done, estimate finish Fri Apr 20 04:28:18 2007
15.64% done, estimate finish Fri Apr 20 04:28:20 2007
15.78% done, estimate finish Fri Apr 20 04:28:23 2007
15.92% done, estimate finish Fri Apr 20 04:28:19 2007
16.05% done, estimate finish Fri Apr 20 04:28:22 2007
16.20% done, estimate finish Fri Apr 20 04:28:24 2007
16.34% done, estimate finish Fri Apr 20 04:28:20 2007
16.47% done, estimate finish Fri Apr 20 04:28:23 2007
16.61% done, estimate finish Fri Apr 20 04:28:19 2007
16.76% done, estimate finish Fri Apr 20 04:28:15 2007
16.89% done, estimate finish Fri Apr 20 04:28:18 2007
17.03% done, estimate finish Fri Apr 20 04:28:20 2007
17.17% done, estimate finish Fri Apr 20 04:28:16 2007
17.31% done, estimate finish Fri Apr 20 04:28:19 2007
17.45% done, estimate finish Fri Apr 20 04:28:15 2007
17.59% done, estimate finish Fri Apr 20 04:28:18 2007
17.73% done, estimate finish Fri Apr 20 04:28:20 2007
17.87% done, estimate finish Fri Apr 20 04:28:16 2007
18.01% done, estimate finish Fri Apr 20 04:28:19 2007
18.15% done, estimate finish Fri Apr 20 04:28:21 2007
18.29% done, estimate finish Fri Apr 20 04:28:17 2007
18.43% done, estimate finish Fri Apr 20 04:28:20 2007
18.57% done, estimate finish Fri Apr 20 04:28:22 2007
18.71% done, estimate finish Fri Apr 20 04:28:18 2007
18.85% done, estimate finish Fri Apr 20 04:28:21 2007
18.99% done, estimate finish Fri Apr 20 04:28:23 2007
19.13% done, estimate finish Fri Apr 20 04:28:25 2007
19.27% done, estimate finish Fri Apr 20 04:28:21 2007
19.41% done, estimate finish Fri Apr 20 04:28:18 2007
19.55% done, estimate finish Fri Apr 20 04:28:20 2007
19.69% done, estimate finish Fri Apr 20 04:28:17 2007
19.83% done, estimate finish Fri Apr 20 04:28:19 2007
19.96% done, estimate finish Fri Apr 20 04:28:16 2007
20.11% done, estimate finish Fri Apr 20 04:28:23 2007
20.25% done, estimate finish Fri Apr 20 04:28:25 2007
20.38% done, estimate finish Fri Apr 20 04:28:27 2007
20.52% done, estimate finish Fri Apr 20 04:28:29 2007
20.67% done, estimate finish Fri Apr 20 04:28:26 2007
20.80% done, estimate finish Fri Apr 20 04:28:23 2007
20.94% done, estimate finish Fri Apr 20 04:28:25 2007
21.08% done, estimate finish Fri Apr 20 04:28:22 2007
21.22% done, estimate finish Fri Apr 20 04:28:24 2007
21.36% done, estimate finish Fri Apr 20 04:28:26 2007
21.50% done, estimate finish Fri Apr 20 04:28:23 2007
21.64% done, estimate finish Fri Apr 20 04:28:25 2007
21.78% done, estimate finish Fri Apr 20 04:28:22 2007
21.92% done, estimate finish Fri Apr 20 04:28:23 2007
22.06% done, estimate finish Fri Apr 20 04:28:21 2007
22.20% done, estimate finish Fri Apr 20 04:28:22 2007
22.34% done, estimate finish Fri Apr 20 04:28:24 2007
22.48% done, estimate finish Fri Apr 20 04:28:26 2007
22.62% done, estimate finish Fri Apr 20 04:28:23 2007
22.76% done, estimate finish Fri Apr 20 04:28:25 2007
22.90% done, estimate finish Fri Apr 20 04:28:22 2007
23.04% done, estimate finish Fri Apr 20 04:28:20 2007
23.18% done, estimate finish Fri Apr 20 04:28:26 2007
23.31% done, estimate finish Fri Apr 20 04:28:27 2007
23.46% done, estimate finish Fri Apr 20 04:28:29 2007
23.60% done, estimate finish Fri Apr 20 04:28:26 2007
23.73% done, estimate finish Fri Apr 20 04:28:28 2007
23.87% done, estimate finish Fri Apr 20 04:28:30 2007
24.02% done, estimate finish Fri Apr 20 04:28:31 2007
24.15% done, estimate finish Fri Apr 20 04:28:33 2007
24.29% done, estimate finish Fri Apr 20 04:28:34 2007
24.43% done, estimate finish Fri Apr 20 04:28:32 2007
24.57% done, estimate finish Fri Apr 20 04:28:33 2007
24.71% done, estimate finish Fri Apr 20 04:28:31 2007
24.85% done, estimate finish Fri Apr 20 04:28:40 2007
24.99% done, estimate finish Fri Apr 20 04:28:38 2007
25.13% done, estimate finish Fri Apr 20 04:28:39 2007
25.27% done, estimate finish Fri Apr 20 04:28:41 2007
25.41% done, estimate finish Fri Apr 20 04:28:42 2007
25.55% done, estimate finish Fri Apr 20 04:28:43 2007
25.69% done, estimate finish Fri Apr 20 04:28:41 2007
25.83% done, estimate finish Fri Apr 20 04:28:42 2007
25.97% done, estimate finish Fri Apr 20 04:28:44 2007
26.11% done, estimate finish Fri Apr 20 04:28:41 2007
26.25% done, estimate finish Fri Apr 20 04:28:39 2007
26.39% done, estimate finish Fri Apr 20 04:28:40 2007
26.53% done, estimate finish Fri Apr 20 04:28:38 2007
26.66% done, estimate finish Fri Apr 20 04:28:39 2007
26.81% done, estimate finish Fri Apr 20 04:28:37 2007
26.95% done, estimate finish Fri Apr 20 04:28:38 2007
27.08% done, estimate finish Fri Apr 20 04:28:40 2007
27.22% done, estimate finish Fri Apr 20 04:28:41 2007
27.37% done, estimate finish Fri Apr 20 04:28:39 2007
27.50% done, estimate finish Fri Apr 20 04:28:40 2007
27.64% done, estimate finish Fri Apr 20 04:28:38 2007
27.78% done, estimate finish Fri Apr 20 04:28:39 2007
27.92% done, estimate finish Fri Apr 20 04:28:44 2007
28.06% done, estimate finish Fri Apr 20 04:28:42 2007
28.20% done, estimate finish Fri Apr 20 04:28:39 2007
28.34% done, estimate finish Fri Apr 20 04:28:41 2007
28.48% done, estimate finish Fri Apr 20 04:28:42 2007
28.62% done, estimate finish Fri Apr 20 04:28:43 2007
28.76% done, estimate finish Fri Apr 20 04:28:41 2007
28.90% done, estimate finish Fri Apr 20 04:28:42 2007
29.04% done, estimate finish Fri Apr 20 04:28:40 2007
29.18% done, estimate finish Fri Apr 20 04:28:41 2007
29.32% done, estimate finish Fri Apr 20 04:28:39 2007
29.46% done, estimate finish Fri Apr 20 04:28:40 2007
29.60% done, estimate finish Fri Apr 20 04:28:42 2007
29.74% done, estimate finish Fri Apr 20 04:28:43 2007
29.88% done, estimate finish Fri Apr 20 04:28:41 2007
30.02% done, estimate finish Fri Apr 20 04:28:42 2007
30.16% done, estimate finish Fri Apr 20 04:28:43 2007
30.30% done, estimate finish Fri Apr 20 04:28:44 2007
30.43% done, estimate finish Fri Apr 20 04:28:42 2007
30.57% done, estimate finish Fri Apr 20 04:28:40 2007
30.72% done, estimate finish Fri Apr 20 04:28:41 2007
30.85% done, estimate finish Fri Apr 20 04:28:39 2007
30.99% done, estimate finish Fri Apr 20 04:28:40 2007
31.13% done, estimate finish Fri Apr 20 04:28:42 2007
31.27% done, estimate finish Fri Apr 20 04:28:40 2007
31.41% done, estimate finish Fri Apr 20 04:28:41 2007
31.55% done, estimate finish Fri Apr 20 04:28:39 2007
31.69% done, estimate finish Fri Apr 20 04:28:40 2007
31.83% done, estimate finish Fri Apr 20 04:28:38 2007
31.97% done, estimate finish Fri Apr 20 04:28:36 2007
32.11% done, estimate finish Fri Apr 20 04:28:37 2007
32.25% done, estimate finish Fri Apr 20 04:28:35 2007
32.39% done, estimate finish Fri Apr 20 04:28:36 2007
32.53% done, estimate finish Fri Apr 20 04:28:37 2007
32.67% done, estimate finish Fri Apr 20 04:28:39 2007
32.81% done, estimate finish Fri Apr 20 04:28:40 2007
32.95% done, estimate finish Fri Apr 20 04:28:41 2007
33.09% done, estimate finish Fri Apr 20 04:28:39 2007
33.23% done, estimate finish Fri Apr 20 04:28:40 2007
33.37% done, estimate finish Fri Apr 20 04:28:41 2007
33.51% done, estimate finish Fri Apr 20 04:28:39 2007
33.65% done, estimate finish Fri Apr 20 04:28:40 2007
33.79% done, estimate finish Fri Apr 20 04:28:38 2007
33.92% done, estimate finish Fri Apr 20 04:28:39 2007
34.07% done, estimate finish Fri Apr 20 04:28:38 2007
34.21% done, estimate finish Fri Apr 20 04:28:39 2007
34.34% done, estimate finish Fri Apr 20 04:28:37 2007
34.48% done, estimate finish Fri Apr 20 04:28:38 2007
34.63% done, estimate finish Fri Apr 20 04:28:36 2007
34.76% done, estimate finish Fri Apr 20 04:28:40 2007
34.90% done, estimate finish Fri Apr 20 04:28:38 2007
35.04% done, estimate finish Fri Apr 20 04:28:39 2007
35.18% done, estimate finish Fri Apr 20 04:28:37 2007
35.32% done, estimate finish Fri Apr 20 04:28:41 2007
35.46% done, estimate finish Fri Apr 20 04:28:40 2007
35.60% done, estimate finish Fri Apr 20 04:28:41 2007
35.74% done, estimate finish Fri Apr 20 04:28:39 2007
35.88% done, estimate finish Fri Apr 20 04:28:40 2007
36.02% done, estimate finish Fri Apr 20 04:28:44 2007
36.16% done, estimate finish Fri Apr 20 04:28:42 2007
36.30% done, estimate finish Fri Apr 20 04:28:40 2007
36.44% done, estimate finish Fri Apr 20 04:28:41 2007
36.58% done, estimate finish Fri Apr 20 04:28:39 2007
36.72% done, estimate finish Fri Apr 20 04:28:43 2007
36.86% done, estimate finish Fri Apr 20 04:28:41 2007
37.00% done, estimate finish Fri Apr 20 04:28:40 2007
37.14% done, estimate finish Fri Apr 20 04:28:38 2007
37.27% done, estimate finish Fri Apr 20 04:28:39 2007
37.42% done, estimate finish Fri Apr 20 04:28:37 2007
37.56% done, estimate finish Fri Apr 20 04:28:35 2007
37.69% done, estimate finish Fri Apr 20 04:28:36 2007
37.83% done, estimate finish Fri Apr 20 04:28:35 2007
37.98% done, estimate finish Fri Apr 20 04:28:33 2007
38.11% done, estimate finish Fri Apr 20 04:28:32 2007
38.25% done, estimate finish Fri Apr 20 04:28:38 2007
38.39% done, estimate finish Fri Apr 20 04:28:39 2007
38.53% done, estimate finish Fri Apr 20 04:28:40 2007
38.67% done, estimate finish Fri Apr 20 04:28:41 2007
38.81% done, estimate finish Fri Apr 20 04:28:42 2007
38.95% done, estimate finish Fri Apr 20 04:28:40 2007
39.09% done, estimate finish Fri Apr 20 04:28:38 2007
39.23% done, estimate finish Fri Apr 20 04:28:39 2007
39.37% done, estimate finish Fri Apr 20 04:28:38 2007
39.51% done, estimate finish Fri Apr 20 04:28:39 2007
39.65% done, estimate finish Fri Apr 20 04:28:39 2007
39.79% done, estimate finish Fri Apr 20 04:28:38 2007
39.93% done, estimate finish Fri Apr 20 04:28:36 2007
40.07% done, estimate finish Fri Apr 20 04:28:37 2007
40.21% done, estimate finish Fri Apr 20 04:28:36 2007
40.35% done, estimate finish Fri Apr 20 04:28:39 2007
40.49% done, estimate finish Fri Apr 20 04:28:40 2007
40.62% done, estimate finish Fri Apr 20 04:28:38 2007
40.77% done, estimate finish Fri Apr 20 04:28:37 2007
40.91% done, estimate finish Fri Apr 20 04:28:38 2007
41.04% done, estimate finish Fri Apr 20 04:28:41 2007
41.18% done, estimate finish Fri Apr 20 04:28:40 2007
41.33% done, estimate finish Fri Apr 20 04:28:38 2007
41.46% done, estimate finish Fri Apr 20 04:28:36 2007
41.60% done, estimate finish Fri Apr 20 04:28:37 2007
41.74% done, estimate finish Fri Apr 20 04:28:38 2007
41.88% done, estimate finish Fri Apr 20 04:28:37 2007
42.02% done, estimate finish Fri Apr 20 04:28:35 2007
42.16% done, estimate finish Fri Apr 20 04:28:36 2007
42.30% done, estimate finish Fri Apr 20 04:28:35 2007
42.44% done, estimate finish Fri Apr 20 04:28:36 2007
42.58% done, estimate finish Fri Apr 20 04:28:34 2007
42.72% done, estimate finish Fri Apr 20 04:28:35 2007
42.86% done, estimate finish Fri Apr 20 04:28:36 2007
43.00% done, estimate finish Fri Apr 20 04:28:37 2007
43.14% done, estimate finish Fri Apr 20 04:28:35 2007
43.28% done, estimate finish Fri Apr 20 04:28:36 2007
43.42% done, estimate finish Fri Apr 20 04:28:35 2007
43.56% done, estimate finish Fri Apr 20 04:28:33 2007
43.70% done, estimate finish Fri Apr 20 04:28:32 2007
43.84% done, estimate finish Fri Apr 20 04:28:33 2007
43.98% done, estimate finish Fri Apr 20 04:28:33 2007
44.12% done, estimate finish Fri Apr 20 04:28:32 2007
44.26% done, estimate finish Fri Apr 20 04:28:33 2007
44.40% done, estimate finish Fri Apr 20 04:28:31 2007
44.53% done, estimate finish Fri Apr 20 04:28:30 2007
44.68% done, estimate finish Fri Apr 20 04:28:31 2007
44.81% done, estimate finish Fri Apr 20 04:28:30 2007
44.95% done, estimate finish Fri Apr 20 04:28:28 2007
45.09% done, estimate finish Fri Apr 20 04:28:36 2007
45.23% done, estimate finish Fri Apr 20 04:28:34 2007
45.37% done, estimate finish Fri Apr 20 04:28:33 2007
45.51% done, estimate finish Fri Apr 20 04:28:34 2007
45.65% done, estimate finish Fri Apr 20 04:28:32 2007
45.79% done, estimate finish Fri Apr 20 04:28:33 2007
45.93% done, estimate finish Fri Apr 20 04:28:32 2007
46.07% done, estimate finish Fri Apr 20 04:28:30 2007
46.21% done, estimate finish Fri Apr 20 04:28:31 2007
46.35% done, estimate finish Fri Apr 20 04:28:30 2007
46.49% done, estimate finish Fri Apr 20 04:28:31 2007
46.63% done, estimate finish Fri Apr 20 04:28:29 2007
46.77% done, estimate finish Fri Apr 20 04:28:30 2007
46.91% done, estimate finish Fri Apr 20 04:28:29 2007
47.05% done, estimate finish Fri Apr 20 04:28:30 2007
47.19% done, estimate finish Fri Apr 20 04:28:28 2007
47.33% done, estimate finish Fri Apr 20 04:28:29 2007
47.47% done, estimate finish Fri Apr 20 04:28:30 2007
47.61% done, estimate finish Fri Apr 20 04:28:29 2007
47.75% done, estimate finish Fri Apr 20 04:28:30 2007
47.88% done, estimate finish Fri Apr 20 04:28:28 2007
48.03% done, estimate finish Fri Apr 20 04:28:31 2007
48.17% done, estimate finish Fri Apr 20 04:28:30 2007
48.30% done, estimate finish Fri Apr 20 04:28:31 2007
48.44% done, estimate finish Fri Apr 20 04:28:29 2007
48.59% done, estimate finish Fri Apr 20 04:28:30 2007
48.72% done, estimate finish Fri Apr 20 04:28:31 2007
48.86% done, estimate finish Fri Apr 20 04:28:30 2007
49.00% done, estimate finish Fri Apr 20 04:28:32 2007
49.14% done, estimate finish Fri Apr 20 04:28:31 2007
49.28% done, estimate finish Fri Apr 20 04:28:32 2007
49.42% done, estimate finish Fri Apr 20 04:28:33 2007
49.56% done, estimate finish Fri Apr 20 04:28:33 2007
49.70% done, estimate finish Fri Apr 20 04:28:32 2007
49.84% done, estimate finish Fri Apr 20 04:28:33 2007
49.98% done, estimate finish Fri Apr 20 04:28:34 2007
50.12% done, estimate finish Fri Apr 20 04:28:34 2007
50.26% done, estimate finish Fri Apr 20 04:28:35 2007
50.40% done, estimate finish Fri Apr 20 04:28:34 2007
50.54% done, estimate finish Fri Apr 20 04:28:35 2007
50.68% done, estimate finish Fri Apr 20 04:28:33 2007
50.82% done, estimate finish Fri Apr 20 04:28:34 2007
50.96% done, estimate finish Fri Apr 20 04:28:35 2007
51.10% done, estimate finish Fri Apr 20 04:28:34 2007
51.23% done, estimate finish Fri Apr 20 04:28:34 2007
51.38% done, estimate finish Fri Apr 20 04:28:35 2007
51.52% done, estimate finish Fri Apr 20 04:28:38 2007
51.65% done, estimate finish Fri Apr 20 04:28:39 2007
51.79% done, estimate finish Fri Apr 20 04:28:37 2007
51.94% done, estimate finish Fri Apr 20 04:28:38 2007
52.07% done, estimate finish Fri Apr 20 04:28:37 2007
52.21% done, estimate finish Fri Apr 20 04:28:37 2007
52.35% done, estimate finish Fri Apr 20 04:28:38 2007
52.49% done, estimate finish Fri Apr 20 04:28:39 2007
52.63% done, estimate finish Fri Apr 20 04:28:40 2007
52.77% done, estimate finish Fri Apr 20 04:28:38 2007
52.91% done, estimate finish Fri Apr 20 04:28:39 2007
53.05% done, estimate finish Fri Apr 20 04:28:40 2007
53.19% done, estimate finish Fri Apr 20 04:28:40 2007
53.33% done, estimate finish Fri Apr 20 04:28:39 2007
53.47% done, estimate finish Fri Apr 20 04:28:40 2007
53.61% done, estimate finish Fri Apr 20 04:28:42 2007
53.75% done, estimate finish Fri Apr 20 04:28:43 2007
53.89% done, estimate finish Fri Apr 20 04:28:44 2007
54.03% done, estimate finish Fri Apr 20 04:28:45 2007
54.17% done, estimate finish Fri Apr 20 04:28:43 2007
54.31% done, estimate finish Fri Apr 20 04:28:44 2007
54.45% done, estimate finish Fri Apr 20 04:28:43 2007
54.58% done, estimate finish Fri Apr 20 04:28:42 2007
54.73% done, estimate finish Fri Apr 20 04:28:42 2007
54.87% done, estimate finish Fri Apr 20 04:28:41 2007
55.00% done, estimate finish Fri Apr 20 04:28:42 2007
55.14% done, estimate finish Fri Apr 20 04:28:41 2007
55.29% done, estimate finish Fri Apr 20 04:28:41 2007
55.42% done, estimate finish Fri Apr 20 04:28:40 2007
55.56% done, estimate finish Fri Apr 20 04:28:41 2007
55.70% done, estimate finish Fri Apr 20 04:28:40 2007
55.84% done, estimate finish Fri Apr 20 04:28:40 2007
55.98% done, estimate finish Fri Apr 20 04:28:39 2007
56.12% done, estimate finish Fri Apr 20 04:28:40 2007
56.26% done, estimate finish Fri Apr 20 04:28:41 2007
56.40% done, estimate finish Fri Apr 20 04:28:39 2007
56.54% done, estimate finish Fri Apr 20 04:28:40 2007
56.68% done, estimate finish Fri Apr 20 04:28:39 2007
56.82% done, estimate finish Fri Apr 20 04:28:40 2007
56.96% done, estimate finish Fri Apr 20 04:28:38 2007
57.10% done, estimate finish Fri Apr 20 04:28:37 2007
57.24% done, estimate finish Fri Apr 20 04:28:38 2007
57.38% done, estimate finish Fri Apr 20 04:28:39 2007
57.52% done, estimate finish Fri Apr 20 04:28:39 2007
57.66% done, estimate finish Fri Apr 20 04:28:40 2007
57.80% done, estimate finish Fri Apr 20 04:28:41 2007
57.94% done, estimate finish Fri Apr 20 04:28:41 2007
58.08% done, estimate finish Fri Apr 20 04:28:40 2007
58.22% done, estimate finish Fri Apr 20 04:28:41 2007
58.36% done, estimate finish Fri Apr 20 04:28:40 2007
58.49% done, estimate finish Fri Apr 20 04:28:40 2007
58.64% done, estimate finish Fri Apr 20 04:28:41 2007
58.78% done, estimate finish Fri Apr 20 04:28:41 2007
58.91% done, estimate finish Fri Apr 20 04:28:40 2007
59.05% done, estimate finish Fri Apr 20 04:28:39 2007
59.19% done, estimate finish Fri Apr 20 04:28:40 2007
59.33% done, estimate finish Fri Apr 20 04:28:41 2007
59.47% done, estimate finish Fri Apr 20 04:28:41 2007
59.61% done, estimate finish Fri Apr 20 04:28:40 2007
59.75% done, estimate finish Fri Apr 20 04:28:41 2007
59.89% done, estimate finish Fri Apr 20 04:28:40 2007
60.03% done, estimate finish Fri Apr 20 04:28:40 2007
60.17% done, estimate finish Fri Apr 20 04:28:39 2007
60.31% done, estimate finish Fri Apr 20 04:28:38 2007
60.45% done, estimate finish Fri Apr 20 04:28:39 2007
60.59% done, estimate finish Fri Apr 20 04:28:38 2007
60.73% done, estimate finish Fri Apr 20 04:28:38 2007
60.87% done, estimate finish Fri Apr 20 04:28:37 2007
61.01% done, estimate finish Fri Apr 20 04:28:38 2007
61.15% done, estimate finish Fri Apr 20 04:28:40 2007
61.29% done, estimate finish Fri Apr 20 04:28:39 2007
61.43% done, estimate finish Fri Apr 20 04:28:40 2007
61.57% done, estimate finish Fri Apr 20 04:28:39 2007
61.71% done, estimate finish Fri Apr 20 04:28:39 2007
61.84% done, estimate finish Fri Apr 20 04:28:40 2007
61.99% done, estimate finish Fri Apr 20 04:28:39 2007
62.13% done, estimate finish Fri Apr 20 04:28:39 2007
62.26% done, estimate finish Fri Apr 20 04:28:40 2007
62.40% done, estimate finish Fri Apr 20 04:28:41 2007
62.55% done, estimate finish Fri Apr 20 04:28:40 2007
62.68% done, estimate finish Fri Apr 20 04:28:40 2007
62.82% done, estimate finish Fri Apr 20 04:28:39 2007
62.96% done, estimate finish Fri Apr 20 04:28:38 2007
63.10% done, estimate finish Fri Apr 20 04:28:39 2007
63.24% done, estimate finish Fri Apr 20 04:28:38 2007
63.38% done, estimate finish Fri Apr 20 04:28:38 2007
63.52% done, estimate finish Fri Apr 20 04:28:37 2007
63.66% done, estimate finish Fri Apr 20 04:28:38 2007
63.80% done, estimate finish Fri Apr 20 04:28:37 2007
63.94% done, estimate finish Fri Apr 20 04:28:36 2007
64.08% done, estimate finish Fri Apr 20 04:28:40 2007
64.22% done, estimate finish Fri Apr 20 04:28:40 2007
64.36% done, estimate finish Fri Apr 20 04:28:39 2007
64.50% done, estimate finish Fri Apr 20 04:28:40 2007
64.64% done, estimate finish Fri Apr 20 04:28:39 2007
64.78% done, estimate finish Fri Apr 20 04:28:39 2007
64.92% done, estimate finish Fri Apr 20 04:28:38 2007
65.06% done, estimate finish Fri Apr 20 04:28:39 2007
65.19% done, estimate finish Fri Apr 20 04:28:38 2007
65.34% done, estimate finish Fri Apr 20 04:28:39 2007
65.48% done, estimate finish Fri Apr 20 04:28:39 2007
65.61% done, estimate finish Fri Apr 20 04:28:40 2007
65.75% done, estimate finish Fri Apr 20 04:28:39 2007
65.90% done, estimate finish Fri Apr 20 04:28:41 2007
66.03% done, estimate finish Fri Apr 20 04:28:41 2007
66.17% done, estimate finish Fri Apr 20 04:28:40 2007
66.31% done, estimate finish Fri Apr 20 04:28:39 2007
66.45% done, estimate finish Fri Apr 20 04:28:40 2007
66.59% done, estimate finish Fri Apr 20 04:28:39 2007
66.73% done, estimate finish Fri Apr 20 04:28:38 2007
66.87% done, estimate finish Fri Apr 20 04:28:39 2007
67.01% done, estimate finish Fri Apr 20 04:28:39 2007
67.15% done, estimate finish Fri Apr 20 04:28:40 2007
67.29% done, estimate finish Fri Apr 20 04:28:40 2007
67.43% done, estimate finish Fri Apr 20 04:28:39 2007
67.57% done, estimate finish Fri Apr 20 04:28:40 2007
67.71% done, estimate finish Fri Apr 20 04:28:40 2007
67.85% done, estimate finish Fri Apr 20 04:28:39 2007
67.99% done, estimate finish Fri Apr 20 04:28:39 2007
68.13% done, estimate finish Fri Apr 20 04:28:39 2007
68.27% done, estimate finish Fri Apr 20 04:28:40 2007
68.41% done, estimate finish Fri Apr 20 04:28:40 2007
68.54% done, estimate finish Fri Apr 20 04:28:41 2007
68.69% done, estimate finish Fri Apr 20 04:28:41 2007
68.83% done, estimate finish Fri Apr 20 04:28:46 2007
68.96% done, estimate finish Fri Apr 20 04:28:47 2007
69.10% done, estimate finish Fri Apr 20 04:28:46 2007
69.25% done, estimate finish Fri Apr 20 04:28:46 2007
69.38% done, estimate finish Fri Apr 20 04:28:48 2007
69.52% done, estimate finish Fri Apr 20 04:28:47 2007
69.66% done, estimate finish Fri Apr 20 04:28:46 2007
69.80% done, estimate finish Fri Apr 20 04:28:48 2007
69.94% done, estimate finish Fri Apr 20 04:28:47 2007
70.08% done, estimate finish Fri Apr 20 04:28:48 2007
70.22% done, estimate finish Fri Apr 20 04:28:47 2007
70.36% done, estimate finish Fri Apr 20 04:28:49 2007
70.50% done, estimate finish Fri Apr 20 04:28:49 2007
70.64% done, estimate finish Fri Apr 20 04:28:51 2007
70.78% done, estimate finish Fri Apr 20 04:28:53 2007
70.92% done, estimate finish Fri Apr 20 04:28:54 2007
71.06% done, estimate finish Fri Apr 20 04:28:53 2007
71.20% done, estimate finish Fri Apr 20 04:28:55 2007
71.34% done, estimate finish Fri Apr 20 04:28:54 2007
71.48% done, estimate finish Fri Apr 20 04:28:54 2007
71.62% done, estimate finish Fri Apr 20 04:28:55 2007
71.76% done, estimate finish Fri Apr 20 04:28:55 2007
71.90% done, estimate finish Fri Apr 20 04:28:54 2007
72.04% done, estimate finish Fri Apr 20 04:28:55 2007
72.18% done, estimate finish Fri Apr 20 04:28:54 2007
72.32% done, estimate finish Fri Apr 20 04:28:53 2007
72.45% done, estimate finish Fri Apr 20 04:28:52 2007
72.60% done, estimate finish Fri Apr 20 04:28:54 2007
72.74% done, estimate finish Fri Apr 20 04:28:56 2007
72.87% done, estimate finish Fri Apr 20 04:28:56 2007
73.01% done, estimate finish Fri Apr 20 04:28:57 2007
73.16% done, estimate finish Fri Apr 20 04:28:57 2007
73.29% done, estimate finish Fri Apr 20 04:29:00 2007
73.43% done, estimate finish Fri Apr 20 04:28:59 2007
73.57% done, estimate finish Fri Apr 20 04:28:59 2007
73.71% done, estimate finish Fri Apr 20 04:28:58 2007
73.85% done, estimate finish Fri Apr 20 04:28:58 2007
73.99% done, estimate finish Fri Apr 20 04:28:59 2007
74.13% done, estimate finish Fri Apr 20 04:28:59 2007
74.27% done, estimate finish Fri Apr 20 04:28:58 2007
74.41% done, estimate finish Fri Apr 20 04:28:57 2007
74.55% done, estimate finish Fri Apr 20 04:28:58 2007
74.69% done, estimate finish Fri Apr 20 04:28:57 2007
74.83% done, estimate finish Fri Apr 20 04:28:57 2007
74.97% done, estimate finish Fri Apr 20 04:28:56 2007
75.11% done, estimate finish Fri Apr 20 04:28:58 2007
75.25% done, estimate finish Fri Apr 20 04:28:59 2007
75.39% done, estimate finish Fri Apr 20 04:28:58 2007
75.53% done, estimate finish Fri Apr 20 04:28:58 2007
75.67% done, estimate finish Fri Apr 20 04:28:57 2007
75.80% done, estimate finish Fri Apr 20 04:28:58 2007
75.95% done, estimate finish Fri Apr 20 04:28:57 2007
76.09% done, estimate finish Fri Apr 20 04:28:59 2007
76.22% done, estimate finish Fri Apr 20 04:28:59 2007
76.36% done, estimate finish Fri Apr 20 04:28:58 2007
76.51% done, estimate finish Fri Apr 20 04:29:00 2007
76.64% done, estimate finish Fri Apr 20 04:28:59 2007
76.78% done, estimate finish Fri Apr 20 04:28:58 2007
76.92% done, estimate finish Fri Apr 20 04:29:00 2007
77.06% done, estimate finish Fri Apr 20 04:29:02 2007
77.20% done, estimate finish Fri Apr 20 04:29:02 2007
77.34% done, estimate finish Fri Apr 20 04:29:03 2007
77.48% done, estimate finish Fri Apr 20 04:29:04 2007
77.62% done, estimate finish Fri Apr 20 04:29:05 2007
77.76% done, estimate finish Fri Apr 20 04:29:05 2007
77.90% done, estimate finish Fri Apr 20 04:29:04 2007
78.04% done, estimate finish Fri Apr 20 04:29:06 2007
78.18% done, estimate finish Fri Apr 20 04:29:06 2007
78.32% done, estimate finish Fri Apr 20 04:29:07 2007
78.46% done, estimate finish Fri Apr 20 04:29:06 2007
78.60% done, estimate finish Fri Apr 20 04:29:08 2007
78.74% done, estimate finish Fri Apr 20 04:29:07 2007
78.88% done, estimate finish Fri Apr 20 04:29:06 2007
79.02% done, estimate finish Fri Apr 20 04:29:06 2007
79.15% done, estimate finish Fri Apr 20 04:29:06 2007
79.30% done, estimate finish Fri Apr 20 04:29:05 2007
79.44% done, estimate finish Fri Apr 20 04:29:05 2007
79.57% done, estimate finish Fri Apr 20 04:29:04 2007
79.71% done, estimate finish Fri Apr 20 04:29:05 2007
79.86% done, estimate finish Fri Apr 20 04:29:04 2007
79.99% done, estimate finish Fri Apr 20 04:29:03 2007
80.13% done, estimate finish Fri Apr 20 04:29:03 2007
80.27% done, estimate finish Fri Apr 20 04:29:04 2007
80.41% done, estimate finish Fri Apr 20 04:29:03 2007
80.55% done, estimate finish Fri Apr 20 04:29:03 2007
80.69% done, estimate finish Fri Apr 20 04:29:03 2007
80.83% done, estimate finish Fri Apr 20 04:29:03 2007
80.97% done, estimate finish Fri Apr 20 04:29:02 2007
81.11% done, estimate finish Fri Apr 20 04:29:03 2007
81.25% done, estimate finish Fri Apr 20 04:29:02 2007
81.39% done, estimate finish Fri Apr 20 04:29:02 2007
81.53% done, estimate finish Fri Apr 20 04:29:01 2007
81.67% done, estimate finish Fri Apr 20 04:29:02 2007
81.81% done, estimate finish Fri Apr 20 04:29:02 2007
81.95% done, estimate finish Fri Apr 20 04:29:01 2007
82.09% done, estimate finish Fri Apr 20 04:29:02 2007
82.23% done, estimate finish Fri Apr 20 04:29:01 2007
82.37% done, estimate finish Fri Apr 20 04:29:03 2007
82.50% done, estimate finish Fri Apr 20 04:29:02 2007
82.65% done, estimate finish Fri Apr 20 04:29:02 2007
82.79% done, estimate finish Fri Apr 20 04:29:03 2007
82.92% done, estimate finish Fri Apr 20 04:29:02 2007
83.06% done, estimate finish Fri Apr 20 04:29:02 2007
83.21% done, estimate finish Fri Apr 20 04:29:01 2007
83.34% done, estimate finish Fri Apr 20 04:29:02 2007
83.48% done, estimate finish Fri Apr 20 04:29:01 2007
83.62% done, estimate finish Fri Apr 20 04:29:01 2007
83.76% done, estimate finish Fri Apr 20 04:29:01 2007
83.90% done, estimate finish Fri Apr 20 04:29:01 2007
84.04% done, estimate finish Fri Apr 20 04:29:01 2007
84.18% done, estimate finish Fri Apr 20 04:29:01 2007
84.32% done, estimate finish Fri Apr 20 04:29:00 2007
84.46% done, estimate finish Fri Apr 20 04:29:00 2007
84.60% done, estimate finish Fri Apr 20 04:28:59 2007
84.74% done, estimate finish Fri Apr 20 04:29:00 2007
84.88% done, estimate finish Fri Apr 20 04:28:59 2007
85.02% done, estimate finish Fri Apr 20 04:29:00 2007
85.16% done, estimate finish Fri Apr 20 04:28:59 2007
85.30% done, estimate finish Fri Apr 20 04:28:59 2007
85.44% done, estimate finish Fri Apr 20 04:29:02 2007
85.58% done, estimate finish Fri Apr 20 04:29:03 2007
85.72% done, estimate finish Fri Apr 20 04:29:03 2007
85.86% done, estimate finish Fri Apr 20 04:29:02 2007
86.00% done, estimate finish Fri Apr 20 04:29:01 2007
86.14% done, estimate finish Fri Apr 20 04:29:01 2007
86.28% done, estimate finish Fri Apr 20 04:29:01 2007
86.41% done, estimate finish Fri Apr 20 04:29:01 2007
86.56% done, estimate finish Fri Apr 20 04:29:00 2007
86.70% done, estimate finish Fri Apr 20 04:29:01 2007
86.83% done, estimate finish Fri Apr 20 04:29:00 2007
86.97% done, estimate finish Fri Apr 20 04:28:59 2007
87.12% done, estimate finish Fri Apr 20 04:29:00 2007
87.25% done, estimate finish Fri Apr 20 04:28:59 2007
87.39% done, estimate finish Fri Apr 20 04:28:59 2007
87.53% done, estimate finish Fri Apr 20 04:28:58 2007
87.67% done, estimate finish Fri Apr 20 04:29:02 2007
87.81% done, estimate finish Fri Apr 20 04:29:02 2007
87.95% done, estimate finish Fri Apr 20 04:29:02 2007
88.09% done, estimate finish Fri Apr 20 04:29:01 2007
88.23% done, estimate finish Fri Apr 20 04:29:02 2007
88.37% done, estimate finish Fri Apr 20 04:29:01 2007
88.51% done, estimate finish Fri Apr 20 04:29:00 2007
88.65% done, estimate finish Fri Apr 20 04:29:00 2007
88.79% done, estimate finish Fri Apr 20 04:29:00 2007
88.93% done, estimate finish Fri Apr 20 04:28:59 2007
89.07% done, estimate finish Fri Apr 20 04:28:58 2007
89.21% done, estimate finish Fri Apr 20 04:28:59 2007
89.35% done, estimate finish Fri Apr 20 04:28:58 2007
89.49% done, estimate finish Fri Apr 20 04:28:57 2007
89.63% done, estimate finish Fri Apr 20 04:28:57 2007
89.76% done, estimate finish Fri Apr 20 04:28:57 2007
89.91% done, estimate finish Fri Apr 20 04:28:56 2007
90.05% done, estimate finish Fri Apr 20 04:28:55 2007
90.18% done, estimate finish Fri Apr 20 04:28:56 2007
90.32% done, estimate finish Fri Apr 20 04:28:55 2007
90.47% done, estimate finish Fri Apr 20 04:28:55 2007
90.60% done, estimate finish Fri Apr 20 04:28:55 2007
90.74% done, estimate finish Fri Apr 20 04:28:54 2007
90.88% done, estimate finish Fri Apr 20 04:28:54 2007
91.02% done, estimate finish Fri Apr 20 04:28:54 2007
91.16% done, estimate finish Fri Apr 20 04:28:54 2007
91.30% done, estimate finish Fri Apr 20 04:28:53 2007
91.44% done, estimate finish Fri Apr 20 04:28:52 2007
91.58% done, estimate finish Fri Apr 20 04:28:53 2007
91.72% done, estimate finish Fri Apr 20 04:28:52 2007
91.86% done, estimate finish Fri Apr 20 04:28:51 2007
92.00% done, estimate finish Fri Apr 20 04:28:51 2007
92.14% done, estimate finish Fri Apr 20 04:28:51 2007
92.28% done, estimate finish Fri Apr 20 04:28:51 2007
92.42% done, estimate finish Fri Apr 20 04:28:56 2007
92.56% done, estimate finish Fri Apr 20 04:28:55 2007
92.70% done, estimate finish Fri Apr 20 04:28:56 2007
92.84% done, estimate finish Fri Apr 20 04:28:55 2007
92.98% done, estimate finish Fri Apr 20 04:28:56 2007
93.11% done, estimate finish Fri Apr 20 04:28:55 2007
93.26% done, estimate finish Fri Apr 20 04:28:54 2007
93.40% done, estimate finish Fri Apr 20 04:28:54 2007
93.53% done, estimate finish Fri Apr 20 04:28:54 2007
93.67% done, estimate finish Fri Apr 20 04:28:53 2007
93.82% done, estimate finish Fri Apr 20 04:28:53 2007
93.95% done, estimate finish Fri Apr 20 04:28:53 2007
94.09% done, estimate finish Fri Apr 20 04:28:52 2007
94.23% done, estimate finish Fri Apr 20 04:28:52 2007
94.37% done, estimate finish Fri Apr 20 04:28:52 2007
94.51% done, estimate finish Fri Apr 20 04:28:51 2007
94.65% done, estimate finish Fri Apr 20 04:28:52 2007
94.79% done, estimate finish Fri Apr 20 04:28:52 2007
94.93% done, estimate finish Fri Apr 20 04:28:51 2007
95.07% done, estimate finish Fri Apr 20 04:28:50 2007
95.21% done, estimate finish Fri Apr 20 04:28:51 2007
95.35% done, estimate finish Fri Apr 20 04:28:50 2007
95.49% done, estimate finish Fri Apr 20 04:28:50 2007
95.63% done, estimate finish Fri Apr 20 04:28:50 2007
95.77% done, estimate finish Fri Apr 20 04:28:49 2007
95.91% done, estimate finish Fri Apr 20 04:28:49 2007
96.05% done, estimate finish Fri Apr 20 04:28:49 2007
96.19% done, estimate finish Fri Apr 20 04:28:49 2007
96.33% done, estimate finish Fri Apr 20 04:28:49 2007
96.47% done, estimate finish Fri Apr 20 04:28:49 2007
96.61% done, estimate finish Fri Apr 20 04:28:48 2007
96.75% done, estimate finish Fri Apr 20 04:28:49 2007
96.88% done, estimate finish Fri Apr 20 04:28:48 2007
97.02% done, estimate finish Fri Apr 20 04:28:47 2007
97.17% done, estimate finish Fri Apr 20 04:28:48 2007
97.30% done, estimate finish Fri Apr 20 04:28:47 2007
97.44% done, estimate finish Fri Apr 20 04:28:46 2007
97.58% done, estimate finish Fri Apr 20 04:28:46 2007
97.72% done, estimate finish Fri Apr 20 04:28:46 2007
97.86% done, estimate finish Fri Apr 20 04:28:45 2007
98.00% done, estimate finish Fri Apr 20 04:28:45 2007
98.14% done, estimate finish Fri Apr 20 04:28:45 2007
98.28% done, estimate finish Fri Apr 20 04:28:44 2007
98.42% done, estimate finish Fri Apr 20 04:28:45 2007
98.56% done, estimate finish Fri Apr 20 04:28:45 2007
98.70% done, estimate finish Fri Apr 20 04:28:44 2007
98.84% done, estimate finish Fri Apr 20 04:28:44 2007
98.98% done, estimate finish Fri Apr 20 04:28:43 2007
99.12% done, estimate finish Fri Apr 20 04:28:44 2007
99.26% done, estimate finish Fri Apr 20 04:28:43 2007
99.40% done, estimate finish Fri Apr 20 04:28:43 2007
99.54% done, estimate finish Fri Apr 20 04:28:43 2007
99.68% done, estimate finish Fri Apr 20 04:28:42 2007
99.82% done, estimate finish Fri Apr 20 04:28:42 2007
99.96% done, estimate finish Fri Apr 20 04:28:42 2007
Total translation table size: 0
Total rockridge attributes bytes: 261
Total directory bytes: 0
Path table size(bytes): 10
Max brk space used 21000
358164 extents written (699 MB)

mkisofs command:
-----------------------
/usr/bin/X11/mkisofs -gui -graft-points -volid K3b data project -volset -appid K3B THE CD KREATOR (C) 1998-2005 SEBASTIAN TRUEG AND THE K3B TEAM -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-oem/k3bXewyRa.tmp -rational-rock -hide-list /tmp/kde-oem/k3bfenQcc.tmp -joliet -hide-joliet-list /tmp/kde-oem/k3bA76XCa.tmp -full-iso9660-filenames -iso-level 2 -path-list /tmp/kde-oem/k3bVwTydb.tmp

Nada , he instalado de nuevo k3b y el mensaje anterior me suena a chino.  ayuda

+1
0
-1
Imagen de Javier M.
+1
0
-1

Lo siento, pero a mi tambien me suena a chino, no controlo tanto, pero una cosa. Usas Ubuntu? Imagino que si y abriste k3b desde consola sudo k3b, y se te abrio el programa y no te dejo grabar?

Es que realmente no se lo que me copiaste de system.

Lo siento

edito: La version que yo tengo es la 1.0

Reedito: Vaya a ser que sea esto. El otro dia a mi no me dejaba grabar un dvd y toqueteando me meti en preferencias k3b-avanzado-tamaño personalizado del buffer. Estaba a 4 y lo subi a 8 y me funciono....Por si acaso

La verdad es que tampoco soy un experto, pero intento darte soluciones que a mi me sirvieron.Espero que te ayude 

#################################

Funcionara mejor si lo enchufas

+1
0
-1
Imagen de kauna
+1
0
-1

tengo ubuntu  dapper.  

creo que se debe a alguna actualizacion posterior porque al instalar dapper si podia grabar.

Voy por la enesima instalacion de ubuntu jajaa, la próxima será la cuarta. 

+1
0
-1
Imagen de kauna
+1
0
-1

tengo ubuntu  dapper.  

creo que se debe a alguna actualizacion posterior porque al instalar dapper si podia grabar.

Voy por la enesima instalacion de ubuntu jajaa, la próxima será la cuarta. 

+1
0
-1
Imagen de Javier M.
+1
0
-1

jajajaa

Bueno, yo formatee como diez veces en dos semanas antes de instalar como se debe edgy.

Daper nunca lo tuve, pero si te digo la verdad, las cosas que no salen me ponen nervioso y voy a ver si te busco una solucion.

Voy a ver si9 encuentro donde vi la manera de instalar k3b 1.0 que seguro que te soluciona los problemas.....

Be conected!!!

 

#################################

Funcionara mejor si lo enchufas

+1
0
-1
Imagen de Javier M.
+1
0
-1

Te dejo el  enlace a una pagina, porque queria mandarte el deb. del k3b 1.0 pero ya no lo tengo, asi que echale un ojo a esta pagina que es posible que te lo solucione. O por lo menos te instalaras la ultima version y despues puedes hacer lo que yo te dije en los post de antes.

Un saludo

aaaaaaahhh, el link  

#################################

Funcionara mejor si lo enchufas

+1
0
-1
Imagen de kauna
+1
0
-1

aunque esto sigue sin funcionar   ¿Sabes lo peor? Que la primera vez que instalé ubuntu si podía grabar.

 

increible 

+1
0
-1